December 2019 work

Work started on the restoratiuon and clean on December 27th 2019.

The pipes and blower were removed to the restoration workshop and the cleaning begun.

The organ had a very thick layer of dust inside as can be seen on the pictures below.

 Organ

The dust shown below looks like the pipes are inserted in soil!

 Organ dust 2

 The picture below shows the pipes from above.

 Organ dust 3

More pipes more dust!

 Organ dust 4