Please send your photographs to our email where they can be review and included in this section of the website - fobbcontact@yahoo.com
Some of our volunteers after clearing the path on the West Side of Messingham Road.
Clearing the path West side of Messingham Road.
Clearing the footpath of weeds and brambles West side of Messingham Road.
This is the 2nd location where logs and branches have been dumped in the beck on West side of Messingham Road.
This is one of 2 areas where the Tree Trunks and Branches dumped in the Beck on West side of Messingham Road.
Photo showing the Beck after removing the timber from bothe locations in the Beck West of Messingham Road.
Photo of our volunteers after clearing the Beck of Logs and Branches and the area of litter.
3 Bird and Squirrel Feeders fitted to trees.
Installed Dray
Installation of the first Squirrel Nest Box (DRAY) in the Woodland Nature Trail.
7 Trolleys removed from the lake by the boardwalk on Monday 28th September 2026.
Winners Award.
Certificate
The Lincolnshire Environmental Communuty Award Trophy and Certificate.
Some of our volunteers with our Environmental Award.
The following 5 photographs were take on 23rd September 2026 and are of the recently opened new section of pathway from Gravel Pit Lane to Scotter Road South.
Photographs of the ongoing work clearing the path for the woodland nature tral.
Clearing the woodland path.
Clearing the woodland trail.Cutting overhanging vegitation.
Installing Nest Boxes on the Woodland Nature Trail
Working on the Nature Trail with New Member Nat.
A view through the woodland nature trail after clearing the pathway.
Cllr Max Bell was a helping hand at the intallation of the Nature Trail Signage.
Entrance to Oak Tree Wood
CaptionCllr Max Bell lends a hand installing the sign posts.