MP Zac Goldsmith visited Network Rail’s signalling centre after complaints from constituents about the amount of time they spent waiting at level crossings. He visited the centre in Wimbledon and was told it was not uncommon for barriers to be down for about 40 minutes in an hour, although averages down times tended to be about three minutes.
12:04, 28 Jan 2013
by Matthew Rees